PROJECT NAME:Transmission Main and Elevated Storage Tank
LOCATION:Taylor, Texas
OWNER:City of Taylor
YEAR COMPLETED:1995
CONSTRUCTION COST:$272,000
OWNER REPRESENTATIVE:Ken Taylor, City Manager
 512.352.3675

PROJECT DESCRIPTION:This project included construction of a 250,000 gallon elevated storage tank which replaced an existing hydroneumatic pump station. In addition, approximately 3,200 L.F. of 12-inch water line was installed to upgrade the system loop along the Highway 79 Bypass.

SERVICES PROVIDED:Preliminary Engineering Report, Environmental Assessment Report, Final Design Phase Services, Bid Phase Services, and Construction Phase Services.