PROJECT NAME:Wastewater Treatment Plant Reclaimed Water Reuse
LOCATION:Holland, Texas
OWNER:City of Holland
YEAR COMPLETED:2007
CONSTRUCTION COST:$217,000
OWNER REPRESENTATIVE:Kathleen Vrana, City Administrator
 254.657.2460

PROJECT DESCRIPTION:

 

The WWTP Reclaimed Water Reuse project entailed construction of reclaimed water reuse facilities on and adjacent to 102 acres of the city wastewater facility and parklands enabling Holland to utilize reclaimed water for agricultural, recreational, and open space irrigation in lieu of discharge to an area stream. The reclaimed water reuse authorization and construction gave Holland the means to improve permit compliance, protect and improve the receiving stream habitat, obtain revenue from hay production, conserve potable water, and enhance parkland, athletic facilities, and open spaces. Authorization for citywide reclaimed water reuse was obtained from the Texas Commission on Environmental Quality. The initial phase of construction included a 400 gpm reclaimed water pumping station, 10,660 feet of six-inch irrigation piping, 39 irrigation risers, four portable Big Gun sprinkler heads, fencing, gate, controls, and electrical.

SERVICES PROVIDED:Preliminary Engineering, Permitting, Final Design Services, Bid Phase Services and Construction Phase Services.
Previous Printable Version Next

About Us | Services | Clients | Staff | Civil | Municipal | Environmental | Water | Wastewater | Other | Contact Us